This project consisted of a full remodel of an existing bank, including new walls, teller line, fixtures, finishes, bank equipment, HVAC, Lighting and Electrical updates. PSI erected and removed temporary barricade for a 3 phase project. Metal stud framing and gypsum board were installed along with bullet resistant sheets and hollow metal frames. PSI also provided thermal insulation in walls and above the ceilings. PSI furnished and installed doors, frames, hardware, restroom accessories, wall panels and trims, as well as performed finish painting at interior.